Up, Up & Away

With the second floor slabs poured and the ship and tower installed it is time to start forming the second floor walls. The castle walls are over 27 feet tall at their peak so they will be poured in two sections. It is great to see the forms under way!

Forms
Peter Sawatzky
With two decades of experience building themed attractions, there is very little Peter can't imagine and then create. Peter leads his team of talented artists as they create pure magic on a daily basis at Sawatzky's Imagination Corporation.
http://imaginationcorporation.com
Previous
Previous

Tall Ship

Next
Next

Big Time Vertical!